lunes, 8 de enero de 2018

Technical asistance contract for ADIF

E2f has been awarded the contract for "Consultancy and technical assistance for the preparation of the technological dossiers of the catenaries used by ADIF for its certification of the interoperability component".
The scope of the work includes pantograph-catenary interaction studies analyzing the parameters of these catenaries that allow defining the validity as interoperable for the maximum circulation speeds of the line where they are installed.
These studies will contain all the necessary documentation to verify all the parameters indicated in the 2014 TSI.
The catenaries to be evaluated will be:
  • AC:
    • 350 km/h: Catenary  C-350
    • 220 km/h: Catenaries C-220Ca and C-220/D
  • DC:
    • 220 km/h: Catenaries CA-220/A, CA-220/B and CA-220/C
    • 160 km/h: Catenaries CA-160/A, CA-160/B and CA-160/C